雅砻江锦屏一级水电站库区蓄水后波速比变化研究

(四川省地震局,成都 610041)

锦屏一级水电站;波速;地下介质变化。

Study on the Variation of Wave Velocity Ratio of Yalong River Jinping Level I Hydropower Station after Retaining Water at the Reservoir Area
DU Yao,SHAO Yuping,RUAN Xiang,WANG Yuwei,DAI Shigui

(Sichuan Earthquake Agency,Chengdu 610041,China)

Jinping Level I Hydropower Station; Wave Velocity Ratio; Variation of Underground Medium

DOI: 10.13512/j.hndz.2020.03.05

备注

选取了雅砻江锦屏一级水电站水库蓄水后 ,四川省木里县项脚乡一带( 27.6°~28.2°N、101.1°~101.7°E )研究范围内, 2012年3月至2016年9月30日ML≥2.0级的1939次地震进行单台波速比计算,结果显示:库区下闸蓄水后四个阶段 ,5个台站均呈现出了各阶段波速比均值上升的现象 ,表明在库区的加卸载以及库水的长期渗透作用下 库区及附近的介质逐渐发生了改变。

Selecting Xiangjiao Town ( 27.6°~28.2°N、101.1°~101.7°E ) of Muli County,Sichuan Province at the reservoir area of Yalong River Jinping Level I Hydropower Station after retaining water as research scope,this paper calculated single station wave velocity ratio of 1939 earthquakes with ML ≥2.0 from Mar 2012 to Sep 30th ,2016. The results show that the five stations experienced the rise of mean wave velocity ratio at various stages during the four stages after retaining water at reservoir area, indicating that the medium at reservoir area and its vicinity experienced variations under the loading and unloading of reservoir area and the long-term permeation of reservoir water.