地铁盾构隧道开挖对邻近立交桥桩基影响分析

1.广东省建筑科学研究院集团股份有限公司,广州 510000;2.广州大学土木工程学院,广州 510000

盾构隧道施工;地铁隧道;桩基础;土体变形;数值模拟;MIDAS

Analysis of Influence of Metro Shield Tunnel Excavation on Pile Foundation of Adjacent Overpass
LYU Wenlong1,WANG Jiahao2

1.Guangdong Provincial Academy of Building Research Group Co.,Ltd.,Guangzhou 510000,China;2.School of Civil Engineering , Guangzhou University , Guangzhou 510000, China

Shield tunnel construction; Subway tunnel; Pile foundation; Soil deformation; Numerical simulation;MIDAS

DOI: 10.13512/j.hndz.2021.04.15

备注

采用广州市轨道交通十三号线二期工程西彩区间盾构隧道项目资料,使用三维有限元模拟的方法,研究盾构隧道施工对立交桥桩基产生的影响。由于该区间盾构隧道下穿德尼立交桥,需进行桩基托换,从桩基托换及盾构掘进的设计、施工特点出发,针对所提出的不利影响开展三维建模及数值计算。分析结果表明:桩基托换和盾构开挖均对土体造成了一定程度的扰动,引起的桩基竖向位移较大,随着桩基托换和盾构开挖施工的进行,结构位移变化呈现先逐步上涨,后趋于稳定的趋势。根据数值计算结果的位移大小,均在规范的安全控制值内,不影响既有立交桥的结构和运营安全,并一步提出相应的施工建议。

Based on the shield tunnel project of Xicai section of Guangzhou Rail Transit Line 13 phase II project, this paper studies the influence of shield tunnel construction on overpass pile foundation by using three-dimensional finite element simulation method. As the shield tunnel in this section undergoes the Deni overpass, pile foundation underpinning is needed. Based on the design and construction characteristics of pile foundation underpinning and shield tunneling,three-dimensional modeling and numerical calculation were carried out for the proposed adverse effects.The analysis results show that the pile foundation underpinning and shield excavation have caused a certain degree of disturbance to the soil,resulting in a large vertical displacement of the pile foundation. With the pile foundation underpinning and shield excavation, the structural displacement changes gradually increase at first, and then tend to be stable. According to the numerical calculation results, the displacement is within the safety control value of the specification, which does not affect the structure and operation safety of the existing overpass. The corresponding construction suggestions are put forward.

·