[1]付红安,刘利华,朱义欢,等.装配式沉井和顶管施工对周围建筑物沉降影响预测研究[J].华南地震,2026,46(05):115-122.[doi:10.13512/j.hndz.2026.05.14]
 FU Hongan,LIU Lihua,ZHU Yihuan,et al.Prediction of Settlement Influence on Surrounding Buildings Induced by Prefabricated Caisson and Pipe Jacking Construction[J].,2026,46(05):115-122.[doi:10.13512/j.hndz.2026.05.14]
点击复制

装配式沉井和顶管施工对周围建筑物沉降影响预测研究()

华南地震[ISSN:1006-6977/CN:61-1281/TN]

卷:
46
期数:
2026年05期
页码:
115-122
栏目:
土木工程防震减灾
出版日期:
2026-09-07

文章信息/Info

Title:
Prediction of Settlement Influence on Surrounding Buildings Induced by Prefabricated Caisson and Pipe Jacking Construction
文章编号:
1001-8662(2026)05-0115-08
作者:
付红安1; 刘利华1; 朱义欢2; 葛治宏2; 马 超1
1.宁夏宁电电力设计有限公司,银川 750000;2.华设设计集团股份有限公司,南京 210014
Author(s):
FU Hongan1; LIU Lihua1; ZHU Yihuan2; GE Zhihong2; MA Chao1
1.Ningxia Ningdian Electric Power Design Co., Ltd., Yinchuan 750000, China;2.China Design Group Co., Ltd., Nanjing 210014, China
关键词:
装配式沉井; 顶管法; 沉降预测; 有限元法; 响应面法
Keywords:
Prefabricated caisson;  Pipe jacking method;  settlement prediction;  Finite element method;  Response surface method
分类号:
TU990.3
DOI:
10.13512/j.hndz.2026.05.14
文献标志码:
A
摘要:
针对城市顶管施工对邻近建筑沉降预测精度不足的问题,本文提出一种结合有限元与响应面法的沉降预测模型。以宁夏银川某装配式沉井和顶管电力隧道工程为依托,构建三维有限元模型模拟施工全过程,并基于实测数据对有限元模型进行了验证:装配式沉井施工对建筑物沉降影响小于0.8%;顶管施工沉降的有限元预测误差低于5%。通过单因素分析,明确了X向距离、Y向距离、顶推力及注浆压力对沉降的影响规律。基于Box-Behnken试验设计建立预测方程,确定系数R?达0.9989,F检验失效概率小于0.0001。应用该方程对JD7~JD13测点进行预测,平均误差为3.92%。模型应用于云端平台,有效提升了施工安全性。
Abstract:
To address the issue low prediction accuracy of adjacent building settlement caused by urban pipe jacking construction, this paper proposes a settlement prediction model that integrates the finite element method (FEM) and the response surface method (RSM). Based on a prefabricated caisson and pipe jacking power tunnel project in Yinchuan, Ningxia, a three-dimensional finite element model was established to simulate the entire construction process, and field monitoring data were adopted to validate the model. The result shows that the impact of prefabricated caisson construction on building settlement is less than 0.8%, and the FEM prediction error for pipe jacking-induced settlement is below 5%. Through single-factor analysis, the influence laws of X-direction offset, Y-direction offset, jacking force, and grouting pressure on settlement were clarified. A prediction equation was established based on the Box-Behnken experimental design, with a coefficient of determination R?reaching 0.9989 and the F-test significance probability lower than 0.0001. The average prediction error for monitoring points JD7-JD13 is 3.92%. Deploying the proposed model on a cloud platform effectively improves construction safety.

参考文献/References:

[1]杨超峰.城市盾构法电力电缆隧道设计[J].交通世界, 2023,30(10):150-153.
[2]朱晶晶,王小龙,李欣睿,等.软土局部差异沉降下顶管法电缆隧道力学损伤分析[J].南京工业大学学报(自然科学版),2025,47(3):279-287.
[3]王新定,孙宝俊,佘才高.地铁建设对城市环境的影响及其对策[J].城市轨道交通研究,2004,7(3):88-89.
[4]程雪松,张雨明,张天奇,等.软土小直径顶管隧道施工对周边环境影响研究[J].岩土工程学报,2025,47(S2):19-24.
[5]陈雪峰.使用TimeGAN和LSTM神经网络预测隧道开挖引起的建筑物沉降[J].华南地震,2022,42(3):107-115.
[6]周诚华,汪顺敏,林晓琼,等.修正Peck公式在南昌地区富水砂土地层地铁盾构施工中的应用[J].城市轨道交通研究,2025,28(7):44-49+56.
[7]沈青松,陈烨,叶盛华,等.基于随机介质理论和Peck公式的矩形顶管地表沉降改进计算方法[J].岩土工程技术, 2025,39(4):504-510.
[8]周耿坚.曲线顶管施工参数对地表沉降影响分析[J].科学技术创新,2025,29(20):147-150.
[9]郭伟,卜祥禾,周国民,等.基坑开挖过程中邻近建筑群地表沉降特征研究[J].岩土工程学报,2025,47(S2):182-186.
[10]张俊,曾川峰,梁健明,等.盾构隧道开挖诱发输电铁塔基础沉降预测[J].地下空间与工程学报,2025,21(5):1752-1762.
[11]周奇辉,张琼方,马帜,等.基于贝叶斯动态线性模型和引入基坑变形数据的地铁隧道变形实时预测方法[J].华南地震,2025,45(4):89-97.
[12]刘震宇.基于可靠度理论的内河高桩框架码头安全性分析方法研究[D].长沙:长沙理工大学,2017.
[13] JGJ 8—2016 建筑变形测量规范[S].
[14]段凯元.顶管施工预制装配式工作井设计理论与建造技术研究[D].南京:东南大学,2013.
[15]程雪松,张雨明,张天奇,等.软土小直径顶管隧道施工对周边环境影响研究[J].岩土工程学报,2025,47(S2):19-24.
[16]王永菲,王成国.响应面法的理论与应用[J].中央民族大学学报(自然科学版),2005,14(3):236-240.
[17]沈龙清,苏静波,吴锋,等.基于响应面法的高桩码头船舶靠泊结构响应预测研究[J].中国港湾建设,2023,43 (4):1-4+14.

备注/Memo

备注/Memo:
收稿日期:2026-01-26
基金项目:国网宁夏电力有限公司科技项目(522982240001)
作者简介:付红安(1990-),男,高级工程师,主要研究方向为输电线路设计。E-mail: jitjlyp6@163.com
更新日期/Last Update: 2026-09-20