参考文献/References:
[1]罗仁宇,李奇志,黄云进,等.基于PFC的基坑爆破数值模拟及安全性分析[J].中山大学学报(自然科学版)(中英文),2023,62(05):107-114.
[2] Cui X,Zhao M,Li Q. Dynamic response and rock damage of different shapes of cavities under blasting loads[J]. Applied Sciences,2024,14(17):7743.
[3] Xu J,Kang Y,Wang X,et al. Dynamic characteristics and safety criterion of deep rock mine opening under blast load‐ing[J]. International Journal of Rock Mechanics and Mining Sciences,2019(119):156-167.
[4]李强.抗滑桩爆破开挖引起多台阶顺层岩质边坡振动响应分析[J].工程爆破,2024,30(2):58-65.
[5]郭伟平,马帅,陈跃进,等.周边孔外插角对隧道爆破超挖的影响:以巴岳山隧道工程为例[J]. 科学技术与工程, 2024,24(25):10731-10738.
[6] Dowding C H,Hamdi E,Aimone-Martin C T. Strains induced in urban structures by ultra-high frequency blasting rock mo‐tions:A case study[J]. Rock Mechanics and Rock Engineer‐ing,2016,49(10):4073-4090.
[7] Lei Z,Chen Q,Zhao W,et al. Dynamic response characteris‐tics of the structures under excavation by high-efficiency blasting in the urban ultradeep foundation pit[J]. Shock and Vibration,2020(8814009):1-12.
[8]徐昊,何如,李栋伟,等.预留核心土法爆破开挖下隧道初期支护动力响应特性[J].爆破,2024,41(1):37-43+105.
[9] Huang B,Gao Q C,Wang J G,et al. Dynamic analysis of pile-soil-structure interaction system under blasting load[J]. Ap‐plied Mechanics and Materials,2014(638/640):433-436.
[10] Zhao J S,Yang J H,Li P X,et al. Mechanical performance and failure mechanism of U-steel support structure under blast loading[J]. Frontiers in Earth Science,2024(11):1314034.
[11] Ji L,Jiang N,Ren Y,et al. Dynamic response and failure analysis of steel sheet pile support structures in bank slopes under pile driving impact loads[J]. Computer Modeling in Engineering and Sciences,2025,144(1):267-288.
[12]孙鹏昌,覃卫民,陈明,等.深基坑开挖爆破对桩锚支护结构的影响及其机理研究[J]. 振动与冲击,2021,40 (22):144-150.
[13]王粱,吴燕开,宋文越,等.隧道爆破开挖作用下预应力锚杆动力特性研究[J].铁道标准设计,2025,70(8):1-12.
[14]唐晓骞,张瑞新,陈浩,等.内蒙古黑岱沟露天煤矿近场非天然地震事件的识别与应用[J].地震研究,2026,49 (02):224-232.