[1]吕文龙,王嘉豪.地铁盾构隧道开挖对邻近立交桥桩基影响分析[J].华南地震,2021,41(04):107-114.[doi:10.13512/j.hndz.2021.04.15]
LYU Wenlong,WANG Jiahao.Analysis of Influence of Metro Shield Tunnel Excavation on Pile Foundation of Adjacent Overpass[J].,2021,41(04):107-114.[doi:10.13512/j.hndz.2021.04.15]
点击复制
地铁盾构隧道开挖对邻近立交桥桩基影响分析()
华南地震[ISSN:1006-6977/CN:61-1281/TN]
- 卷:
-
41
- 期数:
-
2021年04期
- 页码:
-
107-114
- 栏目:
-
土木工程防震减灾
- 出版日期:
-
2021-12-15
文章信息/Info
- Title:
-
Analysis of Influence of Metro Shield Tunnel Excavation on Pile Foundation of Adjacent Overpass
- 文章编号:
-
1001-8662(2021)04-0107-08
- 作者:
-
吕文龙1; 王嘉豪2
-
1.广东省建筑科学研究院集团股份有限公司,广州 510000;2.广州大学土木工程学院,广州 510000
- Author(s):
-
LYU Wenlong1; WANG Jiahao2
-
1.Guangdong Provincial Academy of Building Research Group Co.,Ltd.,Guangzhou 510000,China;2.School of Civil Engineering , Guangzhou University , Guangzhou 510000, China
-
- 关键词:
-
盾构隧道施工; 地铁隧道; 桩基础; 土体变形; 数值模拟; MIDAS
- Keywords:
-
Shield tunnel construction; Subway tunnel; Pile foundation; Soil deformation; Numerical simulation; MIDAS
- 分类号:
-
TU473.1
- DOI:
-
10.13512/j.hndz.2021.04.15
- 文献标志码:
-
A
- 摘要:
-
采用广州市轨道交通十三号线二期工程西彩区间盾构隧道项目资料,使用三维有限元模拟的方法,研究盾构隧道施工对立交桥桩基产生的影响。由于该区间盾构隧道下穿德尼立交桥,需进行桩基托换,从桩基托换及盾构掘进的设计、施工特点出发,针对所提出的不利影响开展三维建模及数值计算。分析结果表明:桩基托换和盾构开挖均对土体造成了一定程度的扰动,引起的桩基竖向位移较大,随着桩基托换和盾构开挖施工的进行,结构位移变化呈现先逐步上涨,后趋于稳定的趋势。根据数值计算结果的位移大小,均在规范的安全控制值内,不影响既有立交桥的结构和运营安全,并一步提出相应的施工建议。
- Abstract:
-
Based on the shield tunnel project of Xicai section of Guangzhou Rail Transit Line 13 phase II project, this paper studies the influence of shield tunnel construction on overpass pile foundation by using three-dimensional finite element simulation method. As the shield tunnel in this section undergoes the Deni overpass, pile foundation underpinning is needed. Based on the design and construction characteristics of pile foundation underpinning and shield tunneling,three-dimensional modeling and numerical calculation were carried out for the proposed adverse effects.The analysis results show that the pile foundation underpinning and shield excavation have caused a certain degree of disturbance to the soil,resulting in a large vertical displacement of the pile foundation. With the pile foundation underpinning and shield excavation, the structural displacement changes gradually increase at first, and then tend to be stable. According to the numerical calculation results, the displacement is within the safety control value of the specification, which does not affect the structure and operation safety of the existing overpass. The corresponding construction suggestions are put forward.
参考文献/References:
[1]何川,封坤.盾构法修建地铁隧道的技术现状与展望[J].西南交通大学学报,2015(1):97-109.
[2]李明睿,陈国平,范秀江,等.盾构施工对临近桩基影响的数值模拟及参数分析[J/OL].土木与环境工程学报(中英文). https://kns.cnki.net/kcms/detail/50.1218.tu.20210325. 0931.002.html.
[3]魏焕卫,奎耀,罗威,等.盾构开挖对邻近桩基影响的试验研究[J].山东建筑大学学报,2021(1):10-16.
[4]张大鹏.盾构隧道施工对邻近立交桥桩基位移及应力影响分析[J].路基工程,2021(1):188-191.
[5]魏亚辉,王亚琼.基于修正剑桥本构模型的盾构隧道开挖对邻近桩基影响分析[J].公路交通科技,2020(37):97-103.
[6]付文生,夏斌,罗冬梅.盾构隧道近距离穿越对桩基影响的对比研究[J].地下空间与工程学报,2009(1):133-138.
[7]梁志伟.盾构穿越施工对既有隧道影响的数值模拟与分析[D].广州:广东工业大学,2017.
[8]李进军,王卫东,黄茂松,等.地铁盾构隧道穿越对建筑物桩基础的影响分析[J].岩土工程学报,2010(32):166-170.
[9]中华人民共和国交通运输部.公路桥涵地基与基础设计规范:JTG 3363-2019[S].北京:人民交通出版社,2019.
[10]中华人民共和国交通部.公路桥涵养护规范:JTG H11-2004[S].北京:人民交通出版社,2004.
[11]中华人民共和国建设部.城市桥梁养护技术规范:CJJ 99-2003[S].北京:人民交通出版社,2003.
[12]中华人民共和国住房和城乡建设部.城市轨道交通工程监测技术规范:GB 50911-2013[S].北京:人民交通出版社,2013.
备注/Memo
- 备注/Memo:
-
收稿日期:2021-04-17
基金项目:住房与城乡建设部科技计划资助项目(No.2017-k10-006)。
作者简介:吕文龙(1984-),男,博士,教授级高级工程师,一级注册结构工程师,注册岩土工程师,主要从事建筑地基基础方面的研究。E-mail: midworm@163.com
更新日期/Last Update:
2021-12-15