[1]潘涛.盾构超近距离上穿诱发既有隧道纵向与水平变形研究[J].华南地震,2021,41(03):33-39.[doi:10.13512/j.hndz.2021.03.05 ]
 PAN Tao.Research on Longitudinal and Horizontal Deformation of Existing Tunnel Induced by Shield Tunneling in Extra Close Distance[J].,2021,41(03):33-39.[doi:10.13512/j.hndz.2021.03.05 ]
点击复制

盾构超近距离上穿诱发既有隧道纵向与水平变形研究()
分享到:

华南地震[ISSN:1006-6977/CN:61-1281/TN]

卷:
41
期数:
2021年03期
页码:
33-39
栏目:
土木工程防震减灾
出版日期:
2021-09-20

文章信息/Info

Title:
Research on Longitudinal and Horizontal Deformation of Existing Tunnel Induced by Shield Tunneling in Extra Close Distance
文章编号:
1001-8662(2021)02-0033-07
作者:
潘涛
(上海隧道工程有限公司,上海 200000)
Author(s):
PAN Tao
(Shanghai Tunnel Engineering Co.,Ltd.,Shanghai 200000,China)
关键词:
盾构隧道隧道上穿竖向沉降水平位移推进速度
Keywords:
Shield tunnelTunnel overpassVertical settlement Horizontal displacementPropulsion speed
分类号:
TU433
DOI:
10.13512/j.hndz.2021.03.05
文献标志码:
A
摘要:
盾构超近距离上穿既有运营隧道时,由于施工引起的土体扰动较大,控制地层沉降和扰动变形的难度也随之增大?基于宁波轨道交通 5号线上穿运营的宁波轨道交通 2号线区间隧道建立 Flac3D模型,研究了掘进过程中既有隧道的变形规律,并探究了不同推进速度对隧道变形的影响?结果表明,当隧道开挖时,在掌子面还未达到既有隧道范围?位于既有隧道中心附近?超出既有隧道范围的过程中,既有隧道的纵向沉降与水平位移均出现明显的上升与回落现象;隧道超近距离上穿既有隧道将诱发双线隧道上行线和下行线相似的竖向沉降以及不同的水平变形规律,且水平变形数值沿盾构掘进方向有所增大;在保障隧道施工过程稳定性的前提下,考虑工程特点与施工效率,试验段推进 12环/d,穿越段推进 10环/d为该工程的最佳推进速度?
Abstract:
When the shield passes through the existing operating tunnel from above with extra close distance,the soil disturbance caused by construction is large,so it is difficult to control the ground settlement and the structuredisturbance deformation. Based on the section tunnel of Ningbo Metro Line 5 passing through the existing operatingNingbo Metro Line 2 from above,this paper established a three-dimensional finite element numerical analysis model,studied the deformation law of the existing tunnel in the tunneling process,and analyzed the influence ofdifferent propulsion speed on tunnel deformation. The results showed that the longitudinal settlement and horizontaldisplacement of the existing tunnel rose and fell obviously due to the excavation disturbance in the process of the face not reaching the scope of the existing tunnel,near the center of the existing tunnel and beyond the scope of theexisting tunnel. The similar vertical settlement and different horizontal displacement of the uplink and downlinkwould be induced when the shield passing through the existing tunnel from above with extra close distance,and the horizontal displacement value would increase along the direction of shield tunneling. On the premise of ensuring thestability of the tunneling process,considering the engineering characteristics and construction efficiency,the best advancing speed of the project was 12 rings per day for the test section and 10 rings per day for the crossing section

参考文献/References:

[1]魏新江,张默爆,丁智,等. 盾构穿越对既有地铁隧道影响研究现状与展望[J]. 岩土力学,2020(S2):1-20. [2]刘辉,李彦青. 上软下硬浅覆土条件下土压平衡盾构下穿密集建筑群施工技术研究[J]. 现代隧道技术,2020,57(06):186-192. [3]许维青,翟志国. 大直径泥水盾构微扰动下穿首都机场快轨施工技术研究[J]. 现代隧道技术,2020,57(S1):913-927. [4]魏纲,杨波,吴华君,等. 盾构穿越引起的既有盾构隧道纵向变形研究[J]. 地下空间与工程学报,2020,16(06):1754-1762+1808. [5]甘晓露,俞建霖,龚晓南,等. 考虑上浮效应的盾构下穿对既有隧道影响研究[J]. 土木工程学报,2020,53(S1):87-92. [6]刘新军,田俊峰,叶万军,等. 南京地铁软流塑地层盾构下穿既有隧道处理加固技术[J]. 科学技术与工程,2021,21(01):366-373. [7]杨芝璐,张孟喜,肖晓春,等. 超大直径盾构不同角度下穿对既有地铁隧道的影响分析[J]. 铁道标准设计,2021,65(03):112-118. [8]Ng Charles W. W., Boonyarak Thayanan, Ma?ín David.Three-dimensional centrifuge and numerical modeling of the interaction between perpendicularly crossing tunnels[J].Canadian Geotechnical Journal,2013,50(9):935-946. [9]骆瑞萍,陈保国,闫腾飞,等. 淤泥地层中盾构上穿近接地铁线施工稳定性研究[J]. 铁道标准设计,2020,64(10):88-93. [10]张孟喜,张靖,吴应明,等. 全风化岩层中双线盾构上穿近邻地铁隧道影响分析[J]. 土木工程学报,2019,52(09):100-108. [11]周群,李家平,王如路. 超大直径盾构下穿施工对运营隧道的影响分析[J]. 现代隧道技术,2020,57(S1):835-842. [12]宋洋,李昂,王韦颐,等. 泥岩圆砾复合地层泥水平衡盾构泥浆配比优化研究与应用[J]. 岩土力学,2020,41(12):4054-4062+4072. [13]徐征杰,郭晓阳. 基于响应面法的盾构施工膨润土改良参数优化[J]. 岩土工程学报,2021,43(01):194-200.